top of page

Fast and easy installation for channel and ditch lining.

Updated: Oct 25, 2022

When in need of a solution for channel lining and ditch lining, engineers and contractors worldwide are increasingly turning to Geosynthetic Cementitious Composite Mats (GCCMs). With installation times typically 10-times faster than traditional concrete lining methods, GCCMs can be installed at rates of up to 200m²/hour.


Why use a GCCM drainage ditch?


· Five times as abrasion-resistant (as OPC Concrete)

· Cost-effective

· Easy installation

· Sustainable concrete channel solution

· Durable and long-lasting

· Suitable for a range of projects


Commenti


bottom of page